Nabest — Factory-Direct 925 Sterling Silver & VVS Moissanite  |  Stock from 1 pc · Custom from 10 pcs  |  OEM / ODM & Dropshipping Ready
Home / Buying Guides / Decide who makes it and how you order / How to Vet a Moissanite & Silver Factory
Buying guide

How to vet a moissanite and 925 silver factory: a due-diligence checklist for importers and private-label buyers

Last updated: October 2026

By Jack Lv, General Manager — 925 sterling silver and GRA moissanite manufacturing in Foshan since 2011

Vet a moissanite factory on documents rather than on samples: confirm the legal entity and how long it has operated, confirm the plant and production lines are its own, ask for numbered test reports you verify directly with the issuing laboratory, and put MOQ, tier pricing, lead times and third-party inspection rights into the contract before any deposit is paid.

What should the vetting checklist cover, and in what order?

Legal entity: take the registered name, registration number and address, and check them against the invoice header and the bank account you will pay.
Operating history: an established exporter can show continuous operation, export records and repeat buyers, and can say how long it has shipped to your region.
Premises: ask whether the plant is owned or leased, its production floor area, and whether casting, polishing, setting and plating are on site.
Capacity: ask for monthly output per product family and for the plan that protects your lead time in peak season.
Traceable test reports: request the issuing laboratory, the report reference and the test scope, then verify each report with that laboratory yourself.
Inspection stages: ask whether incoming, in-process, finished-goods and pre-shipment checks are all performed, and see records from a recent order.
Instruments on the floor: an XRF spectrometer for material verification, a precision balance, calipers and magnification for stone and setting inspection.
Published MOQ and tiers: a clear minimum per design and stated reductions as volume rises, rather than a price that moves between quotations.
Sampling terms: how long a sample takes, whether it is charged, and whether the charge is credited against the bulk order.
Lead times in writing: sampling and bulk production windows written into the order confirmation, with a defined remedy if they slip.
Third-party inspection: written acceptance of SGS, Intertek or an inspector you nominate, with reasonable notice and no stage-management of the visit.
Design confidentiality: willingness to sign an NDA, plus a written statement of who owns the moulds, CAD files and designs you paid for.
Payment and terms: T/T or the platform you already transact on, and whether DDP or DDU is offered with the delivery point agreed in writing.
Packaging and branding: pouches, boxes, care cards, logo printing and retail-ready packing if parcels must ship straight to consumers.
Reference markets: which countries the factory ships to. The United States, Canada, Australia, the United Kingdom, the EU and Saudi Arabia carry the most documentation expectations.

Factory or trading company: which signals separate them?

A trading company is not automatically a bad supplier, but you should know which one you are buying from, because it decides who controls the lead time, the quality decisions and your design confidentiality.

SignalPoints to a factoryPoints to a trading company
Site accessOffers a live, unedited walk-through of one building, or a dated tour you can repeatSends a clip that never shows two rooms in one continuous shot
Process answersExplains plating, setting and QC stages in its own words, including what goes wrongAnswers in sales language and deflects technical questions
Test reportsKnows the issuing laboratory, the reference and the scope it coversSends a generic file that names neither your models nor a verifiable record
Pricing behaviourQuotes against a fixed MOQ and tier schedule and holds itQuotes one price, then negotiates case by case with wide swings
SamplingBuilds your design from CAD and explains what the sample cost coversQuotes fast but cannot say who physically makes the sample
Payment detailsBank account name matches the registered entity and licencePersonal account, or a name unrelated to the licence

What should you look at in a video factory tour?

Insist on one continuous shot from the entrance to the production floor, because edited clips hide layout and scale.
Ask to see the CAD or wax room, casting area, polishing benches and setting benches: those stages decide whether a finished piece is clean.
Look at the plating line and ask how pieces are racked and whether the area is separated and ventilated.
Ask the camera to stop at the QC bench and show the XRF spectrometer, balance, calipers and microscope in use, not stored.
Ask to see stone stock and how it is labelled; undated, unlabelled bags make traceability impossible.
Request QC records for a live order, including in-process checks rather than only a final inspection sheet.
Ask which stages are subcontracted, because that answer decides who is responsible when something goes wrong.

Which red flags should end the conversation?

Refusing a live video call or third-party inspection at any order size.
Offering to put any stone grade or any certificate reference on the paperwork that suits you.
Promising a certificate but unable to name the issuing laboratory or resolve the reference number.
Price, MOQ or lead time that changes after the deposit is requested.
Refusing to sign an NDA, or refusing to say who owns the design and tooling once you have paid for it.
No documented QC stages, or QC that exists only as a verbal promise with no records.
A sample that cannot be matched to the production batch that follows it, or no master sample kept on file.

How should you structure the first order?

Once the documents check out, buy the smallest thing that proves the relationship. For a factory working to a ten-piece minimum per design, that usually means one design, sampled and then produced, with the tier schedule agreed first: ten pieces at the baseline price, a stated reduction at fifty pieces and a further reduction at one hundred.

Budget the calendar around real production windows rather than a courier promise, and expect a quotation within one working day so competing suppliers can be compared on the same brief. Pay by T/T or the platform you already use, and choose DDP or DDU if you would rather not manage freight. Then inspect before shipment and release the balance when the report lands, which is the cheapest insurance on a trial order.

What should a factory be able to hand you?

A well-run exporter can produce, on request, a business licence, third-party test reports with references you can verify, an audit certificate with a stated validity period and per-stone grading documents. For reference, our own file includes a REACH SVHC report, Shenzhen BKC Testing reference BKC25020516BR dated 27 February 2025, showing all 247 listed SVHCs below 0.1 percent; a RoHS and CE certificate, Shenzhen HyCert reference HYC2025120053RV1 dated 31 December 2025, covering the 27 models it lists under RoHS 2011/65/EU and its amendments, tested with IEC 62321 series methods; and an Intertek factory audit certificate, reference 483553466_T, valid from 31 December 2025 to 30 December 2026. Nabest is the brand of Foshan Nameituo Jewelry Co., Ltd., founded in 2011 in Foshan, Guangdong.

Treat all of that as a starting point rather than a conclusion: every numbered report should be verified with the laboratory that issued it, and every claim should map to a model, a batch or a date.

Questions we get

Answered

Do I really need to visit, or is a video call enough?

A live video call with a continuous walk-through, plus a third-party inspection on the first shipment, covers most of what an initial visit would. Save the flight for the second order, once you know which details matter.

How do I check that a test report is genuine?

Take the reference number and the issuing laboratory, then verify through that laboratory's own channel. Confirm the standard, the date, the model list and the scope. A file that cannot be resolved to a record is only a document.

Is a ten-piece minimum per design a good sign or a bad one?

It is workable: it lets you test a design without a container-load commitment. What matters more is that the tier schedule is published, so fifty and one hundred pieces are priced consistently instead of renegotiated as you scale.

Can I ask a factory to sign an NDA before sampling?

Yes, and a factory serving private-label brands will expect it. If the answer is evasive or conditional, treat design protection as absent and do not send original artwork, tooling files or customer lists.

What if the factory charges for samples?

Charging is normal because the work is real. What matters is that the cost is stated before you agree, that the sample matches production, and whether the charge is credited against the bulk order.

Want to see the plant and the process?
Ask us for factory photos and audit documents.

  WhatsApp Us